Their location is excellent, via the busy N9 connecting to Brussels - Asse exit. It gives them the major advantage of being able to communicate with the desired target group. They have a large outreach due to the high numbers of people passing by daily. We installed a double-sided LED screen of 5.69m² per screen, a total of 11.38m². Thanks to a unique V structure the two LED screens are visible from both directions of the busy road. This truly is an LED construction with maximum impact.